TEAMG Acquires 7 New Projects during Apr-Jun, 2020, Totaling ฿151mn
TEAMG Acquires 7 New Projects during Apr-Jun, 2020, Totaling ฿151mn
Team Consulting Engineering And Management Public Company Limited (TEAMG) reported that the company has signed a project during April – June 2020 totaling 7 projects worth approximately 151 million baht, a detail of each projects as follow:
1) Water Chart for Sakae Krang, Pasak, Chao Phraya and Tha Chin River Basin by TEAMG
Client: Office of the National Water Resources
2) Feasibility and Detailed Design of Water Transmission Pipelines for Enhancing Consumption of Water from Khlong Si Yat Reservoir – Khlong Luang Rachalothorn Reservoir, Tha Takiap Subdistrict, Chachoengsao Province by TEAMG and TLT Consultants Co., Ltd. (a subsidiary of TEAMG)
Client: Provincial Waterworks Authority
(This project is under contract signing process and is expected to be signed within June
2020.)
3) Feasibility, EIA and Detailed Design of Water Supply System for Ko Chang Tourism, Ko Chang District, Trat Province by TEAMG
Client: Provincial Waterworks Authority
4) Detailed Design of Civil Engineering Work for 6 Units of CCCP by ATT Consultants Co., Ltd. (a subsidiary of TEAMG)
Client: TPSC (Thailand) Co., Ltd.
5) Detailed Engineering Design and Feasibility Study of 4-lane highway, the new highway from highway 202 to the 6th Mekong River Bridge (Ubon Ratchathani) by TEAMG
Client: Department of Highways
6) Technical Inhouse Consultant for Bureau of Location and Design, Department of Highways by TEAMG
Client: Department of Highways
7) Feasibility Study of Loei Bypass Project, Loei Province by TEAMG
Client: Department of Highways