ITD Signs a ฿338Mn Construction Contract for Cut and Fill at U-Tapao Airport
ITD Signs a ฿338Mn Construction Contract for Cut and Fill at U-Tapao Airport
Italian-Thai Development Public Company Limited (ITD) announced that on November 16, 2020, the Company signed a 338,217,900 baht-contract with the Naval Public Works Department to proceed with the construction project for cut and fill (earth fill) and other related works for the construction of aircraft maintenance repair and overhaul (MRO) center.
The project will work on ground preparation for buildings and landscape, base course (Crushed Rock) for road work (until crushed rock base course; excluded sand leveling and concrete surface pavement), RC pipe with manholes for drainage system, car parking pavement and substructure for car park roofing, walkway pavement and substructure for walkway roofing and duct bank for electrical system and CCTV system for car parking area. The period of work is 365 days.