NWR Signs a ฿1.78Bn Construction Contract for the Extension of Trang Airport’s Runway

NWR announces the NTH Joint Venture on September 23, 2021 jointly signed the construction contract for the extension of the runway at Trang Airport


Nawarat Patanakarn Public Company Limited (NWR) announced that on September 23, 2021, NTH Joint Venture, consisting of NWR, Thai Slurry Seal Co., Ltd. (TSS) and Hatyai Rueang Chai Construction (RC) jointly signed the contract with the Department of Airports for the construction of the extension of the runway with the airport electrical system and other components Trang Airport. The total contract value is 1,775,721,300 baht (Vat Included). The Construction period is from September 24, 2021 to January 5, 2025.

Back to top button